1) Add your analyst name and Run Token that was emailed to you
2) Select the Generator Cost to Update by defining the generator Cost GSC
a) generator Cost GSC
3) Add the generator Capex Cost (£/kW/y)
4) Add the generator Operating Fixed Cost (£/MW)
5) Add the generator variable cost (£/MWh)
|